Place of Origin: | Shanghai, China |
---|---|
Brand Name: | XCMETAL |
Certification: | ISO9001 |
Model Number: | XC-APA-009 |
Minimum Order Quantity: | 100PCS |
Price: | Negotiation |
Packaging Details: | Packed in box or carton with pallet |
Delivery Time: | 25-35 days after confirm order |
Payment Terms: | T/T, L/C |
Supply Ability: | 100,000 pcs per month |
Matertial: | Aluminum Frame | Safety System: | Steel Hook |
---|---|---|---|
Installation: | Ceiling And Walls | Color: | Plain And Green Gypaum |
Sizes: | Standard Sizes | Function: | Moisture-proof |
Highlight: | drywall access panel,decorative access panel |
Aluminum Access Panel Of Aluminum Frame and Ceramic Tile Inlay Can Available
Access Panel XC-APA-009
XC-APA-009 access panel strong aluminum frame and gypsum board inlay ceramic tile Inlay can available.
Description
1. Available in ceiling or drywall maintenance panel, Aluminum Access Door Panels Access Ceiling Panel.
2. 12.5mm Aluminum profile and strong hardware.
3. Without powder coated and white powder coated can available by negotiation.
4. Customized size and color are available.
5.12.5mm moisture resistant gypsum board inlay optional: other thickness moisture resistant gypsum board inlay.
6. Removable door panel safety.
7. Quick installation without difficulty.
8. Standard size: 20×20cm, 30×30cm,35×35cm, 40×40cm, 45×45cm,50×50cm, 60×60cm,60×120cm
Standard Sizes (Special Sizes Available Upon Request)
MODEL | SIZES(MM) | Q’TY/BOX(PCS) |
XC-APA-009-01 | 200*200 | 2 |
XC-APA-009-02 | 300*300 | 2 |
XC-APA-009-03 | 400*400 | 2 |
XC-APA-009-04 | 450*450 | 2 |
XC-APA-009-05 | 500*500 | 2 |
XC-APA-009-06 | 600*600 | 2 |
Instruction for Access Panel
1. Check the function of the access panel, cut a clean hole( per the access panel size exactly you have on the drywall or ceiling
2. Placing the access panel outer frame into the opening
3. Check alignment in the opening
4. Drill screws into the frame and gypsum board, fixing it.
5. Open and close the door to see the flexibility
6. Paste the visible screw hole
7. Well finished, close it.
CAUTION: MAKE SURE IT RESTS CLEANLY IN PLACE. BEFORE INSTALL, CHECK THE FUNCTION. ALIGN THE FRAME, CLAMP INTO PLACE AND THEN PILOT-DRILL
Our Service
1. Direct factory price from our own factory.
2. Controlable delivery & production time.
3. Professinal work team with experienced designer.
4. Strictly quality control system for every product.